Fixing a damaged section of subflooring

During the course of any project, you will run across unexpected obstacles. In preparation for a new floor (tile, wood or sheet), there may be a section of the subfloor which is too "bouncy" or soft. There are many variables that will contribute to this situation. Support , quality of the material, adequate thickness or history, but the fact is that this section will have to be replaced.

Patched area of subflooring
Items needed:
Circular Saw
Tape Measure
Chalk Line
Chisel
Screws
Electric Screwdriver
Replacement subfloor material
Construction adhesive
Safety Suggestions and Tips
Set depth blade to avoid cutting joist
Use same thickness subflooring material
Screw, do not nail patch
Avoid hitting nails with chisel
Level of difficulty


Time Required:
 4 hour

Steps

Interior location
Measuring patch area

Step 1:

In order to get over this hurdle successfully you will need to determine where the joists are and plan your cuts accurately. Popping a chalk line or using a straightedge and pencil, mark the area that you want to remove.  Two sides should land on the centerline of the floor (joists floor joists are usually 12" apart).  You can find the floor joists by locating the screws or nails that hold the subflooring down..

Culvert pipe
Drill hole in center for a finger hole

Step 2:

Drill a hole through the middle of the area with a bit large enough to accommodate your measuring tape (usually 1").  Measure the thickness of the subfloor through the hole (most subfloors are 5/8" or 3/4" plywood).

Ditch for culvert
Set blade depth equal to subflooring thickness

Step 3:

Set the depth of cut (deck) on your circular saw to the same measurement you obtained above.  This will ensure that you do not damage the floor joists while cutting the subfloor


Saw along patch edges

Step 4:

Slide the blade guard out of the way.  Start the saw and, while firmly holding the saw, ease the blade down into the subflooring.  Avoiding nails and screws, cut until the middle of the blade reaches the end of the line.  It may be necessary to go slightly past your marks to free the damaged section, remember that your blade is round not straight. In this case I used a hand held angle grinder with a wood cutting blade to finish the cuts.  To clean the edges and corners of anything else, use a sharp 1/2" chisel.

Repeat this for all four sides.


Lift up and remove damaged section

Step 5:

Using the hole you drilled earlier, pull the damaged section out.  If the circular saw didn't get all the way into the corners, use a handsaw or an angle grinder with a wood cutting blade.  When you have the section out, inspect the floor joists.  If they appear to be rotten or damaged in any way, stop and call a professional.


Screw down existing sunflooring

Step 6:

(This step is optional but recommended, especially if you are going to install tile.) Using an appropriate material (2x4's are ok but use 2x6's if you can) frame a small box that will fit into the hole.  This will support the two sides of the patch that do not land on the joists.  Run a bead of construction adhesive on the floor joists and screw the support frame in between the joists.


Apply construction adhesive

Step 7:

Using the piece you cut out as a pattern, cut a replacement.  This replacement should be of the same material that you removed.  At least the same thickness material as you removed.

Run a bead of construction adhesive around the perimeter.


Screw down patch

Step 8:

The patch needs to be screwed in place. Do not just nail it down.